• Welcome to Tesla Roadster Forum! If you're joining us from Cybertruckownersclub.com, then you may already have an account here.

    If you were registered on the Cybertruck forum as of September 18, 2026 or earlier, then you can login here with the same username and password.

    If you wish, you can remove your account here.

Gateway confusion

RelevantDad

Member
First Name
Jesse
Joined
Jan 23, 2024
Threads
1
Messages
9
Reaction score
1
Location
Winsted, CT
Vehicles
Model 3
Occupation
Software Engineer
Country flag
Just moved into a new house and wanting to get powershare installed with a universal wall connector. I asked the installer if I'd be able to add a powerwall later on if I wanted to, and he said I might need a different gateway for that.

So is that true? If I want to be open to adding powerwall later on, do I need to get a specific gateway?

Thanks.
 

scottf200

Well-known member
Joined
Jul 31, 2021
Threads
48
Messages
1,935
Reaction score
1,199
Location
Western NC
Vehicles
X; immed family 3 & Y
Country flag
Just moved into a new house and wanting to get powershare installed with a universal wall connector. I asked the installer if I'd be able to add a powerwall later on if I wanted to, and he said I might need a different gateway for that.

So is that true? If I want to be open to adding powerwall later on, do I need to get a specific gateway?

Thanks.
  • There is a Powershare Gateway 3V[ehicle] (eg. not V3 | Version 3).
    It is a site|system controller and manages the disconnect from the grid.
  • The Powerwall v3 also are site|system controller. Stated on the Tesla Powerwall site.
  • I think early version of the Powerwall required a separate Gateway for this site|system controller. See this datasheet. ("The Backup Gateway 2 controls connection to the grid")

The site|system controller is a conflicting part of all this.

Via: https://www.tesla.com/support/powershare says this:
Powershare Gateway
Powershare Gateway controls connection to the grid, automatically detects outages and provides seamless transition to backup power.
 
 
Top