Hello all,
I'm trying to figure out a way to force the CT to pour it's power back to the grid. I have solar with PW3's, so PS isn't an option right now, and it might not actually serve this purpose when they do finally turn it on.
I know I can hook up a 10kW welder to the 240v plug in the bed...